Volpe Athletic Center

B32 was hired to perform a detailed review of the proposals which included a matrix of key components and design elements to aid in the comparison and selection of a new ice system. Once a contractor was selected, B32 performed an engineering review of the ice rink contractor’s final design for the ice system. B32 was also on-site during construction to observe the installation of the systems.